 Responsibility of Project Manager
1st Week Inspection:
1) Recheck finished part drawing mold date sheet
2) Mold base 
3)Steel supplying
 size 

2nd Week Inspection:
1) Check process for the mold to need fit
2) Check electrode & core cavity size
3) Arrange trial material, color 